Read the Safety Blog
Pacific Foundation PDX Airport

Pacific Foundation is a Vancouver, Washington-based company specializing in
design-build,
ground improvement, drilled foundation and shoring solutions. 

Groundwater Control

Contact Us

📞(360) 200-6608

✉️info@pacific-foundation.com

Request a Quote

Grant Street Pier

We have successfully estimated, managed and constructed over $200 Million in ground improvement, foundation and shoring projects in Washington, Oregon, Idaho, California, and Hawaii. We service a variety of industries including:

A FULL-SERVICE GEOTECHNICAL CONSTRUCTION FIRM

Pacific Foundation is a Vancouver, Washington-based company specializing in design-build, ground improvement, drilled foundation and shoring solutions. 

 
Our Capabilities
https://cdn2.hubspot.net/hubfs/5281911/PF-hero-720_6.mp4
topo-map copy

RECENT PROJECTS

Pacific Foundation specializes in a wide variety of project types, including
public works, commercial improvements, private development and heavy industrial.

PF-washpark-RED-overview-thumb-1-2

Washington Park Reservoir

The project includes building a new, seismically reinforced below ground reservoir engineered to withstand ongoing landslide encroachment and potentially catastrophic effects of a major earthquake.

Location:

Portland, OR

Project Type:

Water, Sewer & Waste

Solutions:

Soldier Piles, Tiebacks, Dewatering, Instrumentation, Drilled Shafts

General Contractor:

Hoffman Corp.

pf-may2019-web-4

River S Bridge

 The new River S Bridge is a five span, 526'-8" structure, with drilled shafts. Additional work includes Mechanically Stabilized Earth (MSE) wall, ground improvements, abutment approaches, and other minor construction.

Location:

Ridgefield, WA

Project Type:

Bridges

Solutions:

Drilled Shafts

General Contractor:

Ceccanti, Inc

PF-oregon-capitol-resize-1

Oregon State Capitol

The Capitol Accessibility, Maintenance and Safety project was approved by the 2016 Legislative Assembly to address Americans with Disabilities Act deficiencies  in the Oregon State Capitol building. 

Location:

Salem, OR

Project Type:

Public Buildings

Solutions:

Dewatering, Secant Piling

General Contractor:

Hoffman Corp.

STATE OF THE ART EQUIPMENT

Pacific Foundation is committed to using the highest quality equipment available, allowing us to minimize downtime and provide maximum efficiency. We have a world-class fleet of Bauer vertical drill rigs, Klemm Hydraulic Rotary drill rigs and as well as a large variety of specialty and support equipment including concrete trucks, bulk cement trucks and concrete boom pumps.  By owning all of the equipment needed for a given task, we are able to create symmetry in our operations and reduce our exposure to things that we can't control.

See our Drill Rigs + Equipment

Design-Build Specialists

Pacific Foundation prides itself at finding unique solutions to project challenges, reducing both cost and risk for the project team.  We have in house professional engineers, BIM Masters, and access to the latest 3D modeling and structural engineerin software that allows us to be more responsive and provide a higher quality product than in the past when we used 3rd party engineering firms. 

These abililties were on display during the summer of 2019, when we were awarded the design and installation of a 9-city block shoring project.  Within 1.5 weeks of award, we had already designed and installed the first 125 soldier piles, a testament to responsive engineering, aggressive procurement, and very efficient drilling by our crews.

Contact Us

CAREERS AT PACIFIC FOUNDATION

We believe that the greatest asset of a company is its people. If you have a passion for drilling and client satisfaction, we want to talk to you.

Work for The Best

graphpaper-bkg

SAFETY BRIEFS

Pacific Foundation is passionate about the safety of our people.  Matt Jannings, CHST, is the driving force behind a safety program that is different from so many others.  Instead of simply following rules or teaching regulations, Matt has developed a program where the primary goal is to teach our workers the reasons behind the regulations so that they can really understand the importance and buy in to the procedures that we have developed together. 

He also has a strong focus on leadership and everyone on the crew being accountable to each other, as it only takes one person to put everyone else at risk.  The results speak for themselves, as our EMR in 2018 dropped from a 0.71 to a 0.57, something that is nearly unheard of in our industry.

 

Read the Safety Blog

Create your beautiful HubSpot website!

Lorem ipsum dolor sit amet, consectetur adipiscing elit!

Contact Us
contact-banner

Request a Quote

Learn how the Pacific Foundation team can help you accomplish your project on budget and on schedule with innovative site solutions. 

 

Contact Us